Structural Steel S355JR

Structural Steel S355JR

Product:S355JR universal beam
Technique:Hot Rolled
Standard:ASTM JIS GB EN DIN
Tolerance:±1%
Send Inquiry
Description
Technical Parameters

Structural Steel S355JR

 

S355JR Steel I Beam Products Description

 

S355JR I-beam has good corrosion resistance in general atmospheric environment, which helps to extend the service life of structural parts.

 

GNEE is a S355JR universal beam supplier with 16 years of production experience. The S355JR I-profile we provide is strictly produced in accordance with the standards, has passed the quality certification, can provide quality certificates, and accept third-party testing.

 

The S355JR we provide can provide size customization, cutting, welding, punching and other processing services according to your final use requirements of S355JR standard I-beam products.

 

Structural Steel S355JR Products Details

 

Products S355JR Structural Steel
Processing Type Cutting, bending,stamping,welding,cnc machining
Cutting Type Laser cutting;water-jet cutting;flame cutting
Surface Treatment 1),Bared2),Black painted (varnish coating)3),Galvanized
Application Construction,Decoration,Ship,Medical Equipment,Machinery,etc
Processing Service Bending, Welding, Decoiling, Cutting, Punching
Processing Type Cutting, bending,stamping,welding,cnc machining

 

S355JR I Beam Bar Products Image

 

Structural Steel S355JR

 

 

FAQ

Q: What is S235JR i shaped steel beam equivalent material?

A: S235JR equivalent steel grades are IS 2062 Gr B, A36, SS400, ST37-2, Q235B, A283C, SM400A, FE360B, E24-2, etc.

Q: What is the difference between S235JR universal beam and S275JR i beam bar?

A: Compared with S235JR steel materials, Grade S275JR steel has a higher yield strength, reaching 275MPa. The tensile strength and elongation of S275JR are relatively higher, which can better meet the requirements of high strength, high rigidity, and high stability.

Q: What is your delivery time?

A: For stocks, we could transport the goods to loading port within 3 days after we received your deposit
For production period, it usually takes about 7-15 days after receiving the deposit.

Q: Can you provide sample ?

A: We can provide the small samples in stock for free, as long as you contact us.

Q: What is your terms of payment?

A: 30% T/T as the upfront deposit, 70% before delivery. We will show you the photos of products and package before you pay the balance.

 

If you have more needs and questions about Structural Steel S355JR, please contact us!